Cisco CX-FEIP-1TX= Installation and con?guration Guida Utente Pagina 618

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 617
Managing performance Chapter 7: Operation
7-66
phn-2513_004v000 (Oct 2012)
Maintaining the system
Once installed, a PTP 800 link should require little or no maintenance.
Yearly maintenance
Recommended yearly physical maintenance:
Check cables for corrosion, chafing etc.
Check waterproofing.
Check ground points for corrosion, tightness etc.
Monthly maintenance
Recommended monthly radio maintenance:
Read Link Loss and compare against last reading.
Read ByteER and compare against last reading.
1+1 Hot Standby link maintenance
For a 1+1 Hot Standby link, consider a controlled switchover to the inactive unit (once
every three months), to confirm that it is fully functional.
This can cause a short interruption to traffic and should be scheduled accordingly to
minimize the effects.
Vedere la pagina 617
1 2 ... 613 614 615 616 617 618 619 620 621 622 623 ... 647 648

Commenti su questo manuale

Nessun commento