
Method and Procedure
Field Operations Support MP-2009-08-002/ Issue 10 / Date: 11-01-10
Process Owner: Centralized Operations - Field Operations Support
Information contained in this document is proprietary
Unauthorized disclosure outside CenturyLink Corporation is prohibited
38
15.2 TROUBLE TICKET EXAMPLE:
Below is an ADSL2+ Bonded HSI Trouble Ticket example. Bonded HSI troubles will be dispatched via Report
Type 70. Facility information for both pairs is to be provided within the remarks section of the trouble ticket.
Commenti su questo manuale